Plains Pipeline

A feasibility study and schematic design for a single-story two-phased pre-engineered metal building to house the offices and shop/warehouse for an industrial pipeline company.

 

 

Location
Casper, Wyoming

Owner
Plains All American
Jeremy Norris
Casper Operations Supervisor
Rocky Mountain Divison
(307) 320-5155

Contractor
Pope Construction
Greg Pope, President
(307) 472-3241

Role
Architect

Personnel
Lyle Murtha, Principal Architect

Scope
New Construction
Design-Build

Size
12,764 Square Feet (Phase I)
2,816 Square Feet (Phase II)

Cost
$2.2 million (estimated)

Completed
Yet to be determined